Features — Boreva Field Operations App for Underground Utility Contractors
Everything inside Boreva

Built Module by Module For the Field. Not the Office.

Every feature in Boreva was designed around one question: does this make field crews faster, more protected, and more profitable? If the answer was no, it didn’t make it in.

See How It Works — $30 →
🔩 Bore Logger 📍 Locate Tickets 📡 Field Capture 🗺️ Project Map 💰 Financials 📸 Photos 🕳️ Potholes 🧮 Calculators 📋 Reports 🌱 Soil Scout
🔩 Bore Logger

Every Rod. Every Foot. Documented.

Log depth, pitch, clock, and drilling fluid per rod as you go. Boreva auto-tallies total footage drilled, tracks your bore session, and links everything directly to the job and the as-built map.

When a dispute comes — and it will — you’ll have rod-by-rod documentation with timestamps that nobody can argue with.

Rod-by-rod entry — depth, pitch, clock position, fluid volume
Auto footage total — running count updates with every rod
Bore sessions — separate named sessions per job, per day
Links to project map — bore session ties directly to as-built path
Max depth, avg pitch — summary stats calculated automatically
Works offline — no signal on the bore? Keeps logging.
Sample Bore Log Entry
Rod 12 Depth: 6.2 ft Pitch: -3.1% 2:00
Rod 13 Depth: 6.0 ft Pitch: -1.8% 2:00
Rod 14 Depth: 5.5 ft Pitch: +0.5% 3:00
14
Rods
336 ft
Total
6.8 ft
Max Depth
-1.4%
Avg Pitch
📍 Locate Tickets

No Ticket Expires On Your Watch.

A re-locate delay costs you dayrate, crew time, and momentum. Boreva tracks every locate ticket — expiry date, status, renewal — and alerts you before the window closes.

Every ticket is tied to a job. You see what’s active, what’s expiring soon, and what needs renewal at a glance.

Expiry alerts — notified before tickets expire, not after
One-tap renew — mark renewed and reset the clock instantly
Tied to job — every ticket linked to the job it covers
Compliance documentation — full ticket history exports with the job record
Dashboard alert badge — expiring tickets surface on your home screen
#811-24-0447 ACTIVE
Hwy 40 Fiber Run  ·  Expires Apr 18, 2026
#811-24-0612 EXPIRES IN 2 DAYS
Downtown Conduit Loop  ·  Expires Apr 11, 2026
#811-24-0389 EXPIRED — RENEW
Airport Access Road  ·  Expired Apr 7, 2026
#811-24-0501 ACTIVE
Mesa Verde Subdivision  ·  Expires Apr 24, 2026
📡 Field Capture

Log It Once. Map It Forever.

Field Capture is the module that turns Boreva from a field app into a field-to-GIS pipeline. Tap, select asset type, and GPS coordinates are captured automatically. The entry is structured, timestamped, and ready for export.

Export as GeoJSON with one tap — opens instantly in QGIS, AutoCAD Civil 3D, or any GIS platform. The job is mapped exactly as it was built, not reconstructed from memory days later.

Auto GPS capture — location locked the moment you open the form
5 asset types — Bore Entry, Bore Exit, Handhole/Vault/Pedestal, Splice, Issue
Structured fields only — dropdowns, no freeform junk that breaks exports
Auto-plots on project map — every entry appears as a labeled pin instantly
Bore line auto-draw — Entry + Exit from same session draws the path automatically
GeoJSON export — clean FeatureCollection, one tap, any GIS platform
📡 Field → GeoJSON → GIS. No cleanup.
Field Capture Log — JOB-003
📍 Bore Entry
2″ HDPE · Depth: 4.5ft · J. Davis
✅ GPS ±4m
🔲 Handhole
17″×30″ · Depth: 36″ · Concrete cover · H-20
✅ GPS ±6m
✂️ Splice
Buried Enclosure · 48ct · Single Mode OS2
✅ GPS ±3m
🏁 Bore Exit
2″ HDPE · Depth: 3.8ft · J. Davis
✅ GPS ±5m
4 entries · 4 GPS points ⬇ GeoJSON
🗺️ Project Map & As-Built

The Job Mapped As It Was Built.

Draw bore paths directly on a live satellite map. Pin the job site. Mark as-built deviations with the redline layer. Every Field Capture entry auto-plots as a labeled marker — no manual work.

When the job is done, export a client-ready as-built report with the map embedded. One tap.

Live satellite map — satellite, street, and hybrid basemaps
Draw bore paths — tap to place points, auto-calculates footage
Redline / as-built layer — mark deviations from the plan
Field Capture auto-pins — handholes, splices, issues appear automatically
Bore log link — bore session data linked to the path on the map
As-built PDF export — client-ready report with embedded map
JOB-001 · Hwy 40 Fiber Run
PLAN REDLINE
BE HH SP BX
4,500 ft · 4 FC pts ⬇ As-Built PDF
💰 Job Financials & P&L

Know Your Margin Before You Invoice.

Real-time cost tracking against your contract value. Every material cost, sub invoice, equipment charge, and labor dollar tracked per job. Your P&L updates as the job runs — not after you’ve already spent the money.

Job cost tracking — materials, subs, equipment, fuel, labor
Gross & net margin — live P&L as costs come in
Invoice tracking — what’s been invoiced, what’s outstanding, collection rate
Labor burden — company-wide burden % applied automatically
Cash flow dashboard — see all jobs side by side, spot the losers early
Same-day invoicing — create and send invoices from the field
P&L — JOB-001 Hwy 40 Fiber Run
Contract Value
$125,000
Total Costs
$84,200
Gross Margin
$40,800
Margin %
32.6%
$84,200 costs$40,800 margin
📸 GPS-Stamped Photo Log

Every Photo. Burned with Proof.

Boreva burns the date, time, and GPS coordinates directly onto every photo at the pixel level — not as metadata that can be stripped, but as visible text on the image itself. Legally defensible field documentation from day one.

Pixel-level burn — date, time, GPS stamped directly onto the image
Tied to job — every photo linked to a specific job and category
Categorized — pre-bore, during, post-bore, conflict, restoration, other
Exports with protection report — full photo log included in job documentation
GPS coordinates visible — no one can argue where or when the photo was taken
🕳️
APR 09 2026   07:42:18
35.123456°N   106.654321°W
JOB-001 · Hwy 40 Fiber Run · Pre-Bore Conflict
Utility conflict at STA 2+340. Gas line crossing at 18″ — 6″ clearance to bore path. Reroute required.
Conflict Pre-Bore
🕳️ Pothole Tracker

Document the Conflict. Win the Dispute.

When you hit an unmarked utility or find a conflict that changes your bore path, Boreva gives you a structured way to document it on the spot. Utility type, depth, clearance, material, conflict status — all tied to a GPS location and timestamp.

That documentation is your protection when a GC or owner disputes the extra costs of a reroute. Paperless. Timestamped. Irrefutable.

Utility type & material — gas, electric, telecom, water, sewer and more
Depth & clearance — exact measurements to bore path
Conflict status — Clear / Conflict / Reroute required
Pit dimensions — width, length, depth recorded
Soil type — clay, sand, gravel, cobble, rock documented per pit
Exports with protection report — full conflict log in one tap
Pothole #3 — JOB-001
Utility
Gas
Material
Steel
Utility Depth
24″
Clearance
6″
⚠️
Reroute Required
Insufficient clearance — bore path adjusted +18″
STA 1+840 · Apr 09 2026 09:14 · R. Martinez
🧮 HDD Field Calculators

12 Calculators. All in Your Pocket.

Every calculation you need in the field — no signal required. Built for HDD and underground utility work, not generic construction.

📐
Bore Planning
Entry/exit angles, bore path geometry, depth targets per station
💧
Mud Volume
Annular volume, slurry mix, fluid return estimation
📏
Pitch Converter
Percent grade to degrees, rise/run conversions for receiver guidance
Pullback Rate
Estimated pull time, pipe tensile load, swivel capacity check
📦
Bundle Sizer
Calculate conduit bundle OD and minimum bore size for your configuration
🎯
Job Bid Calculator
Footage-based bid pricing, markup, crew cost, equipment day rate built in
✈️
Out-of-Town Profitability
True cost of mobilizing out of area — per diem, hotel, drive time, mobilization factored in
👷
Crew Labor Rate
Fully burdened labor cost per hour including benefits, payroll tax, and overhead
🚜
Equipment Day Rate
True cost per day including depreciation, fuel, maintenance, and insurance
🔢
Wire & Conduit Fill
NEC fill percentages, conduit sizing for wire count and gauge
🌀
Bend Radius
Minimum bend radius by pipe OD, DR, and material spec
⚖️
Material Weight
Weight per foot for HDPE, PVC, steel conduit at any diameter and wall thickness
📋 Reports

Print It. Email It. Text It. One Tap.

Every report in Boreva generates instantly and shares via print, email, or text — directly from the app. No office, no computer, no waiting.

🛡️
Job Protection Report
Every log, ticket, conflict, and GPS capture in one document
🗺️
As-Built Report
Bore paths, asset locations, deviation notes — client-ready PDF
📋
Daily Field Log
Who worked, what they did, footage logged, hours on clock
🧾
Invoice
Professional invoice generated from job data — same day
🔩
Bore Log Report
Full rod-by-rod record with stats — exportable and printable
Share Report
🖨️
Print
Open print dialog
✉️
Email
Open email with report details
💬
Text
Send via Messages
🌱 Soil Scout

Know the Ground Before You Drill It.

Soil Scout pulls live USDA soil survey data for any GPS location — your current position or any point on the map. Know your soil classification, typical depth horizons, and drainage characteristics before the bit hits the ground.

Live USDA data — pulls directly from the National Cooperative Soil Survey
By GPS location — your current position or any point you select
Soil classification — clay, sand, gravel, silt — what you’re drilling into
Mud mix guidance — recommended fluid mix based on soil type
Depth horizons — soil layer changes by depth so you know what’s coming
🌱 Soil Scout — Current Location
35.123456°N · 106.654321°W
Map Unit
Colby-Ulysses Complex
Texture
Sandy Clay Loam
Drainage Class
Well Drained
Recommended Mud Mix
Medium viscosity bentonite — 35-45 sec Marsh funnel. Monitor returns for loss.
Founding member pricing

Everything Here. $30. Yours Forever.

Every module on this page. One payment. Lifetime access. No subscription. No per-user fees. No contracts.

See How It Works — $30 →

Secure payment via Stripe · Instant access · Single-user · Works offline